| Brand Name: | CTWELL |
| Model Number: | HCT-150A |
| MOQ: | 500 |
| Price: | USD 50-100 |
| Delivery Time: | 7 working days |
| Payment Terms: | T/T,D/A,D/P,Western Union |
Hall Current Sensor Hall Current Transducer DC Rated Current 150A / Output 4~20mA With Excellent Accuracy And Good Linearity
Features
Excellent accuracy
Very good Iinearity
Wide frequency bandwidth
No insertion losses
Applications
AC variable speed drives;
Static converters for DC motor drives;
Battery supplied applications;
Uninterruptible power Supplies;
Switched Mode Power Supplies
Power supplies for welding applications
Switched Mode Power Supplies
Dimension:
![]()
Parameters:
| Type | HCT-150-0.2 |
| Rated input | 150 |
| Measure range | 160 |
| Rated output current | 4-20mA |
| Conversion ratio | 150A:16mA |
| Secondary coil resistance | 30Ω |
| Supply voltage | ±15VDC(±5%) |
| Linearity | ≤0.1%FS |
| Overall accuraty | ±0.1%FS |
| Offset current | 4±0.016 mA |
| Offset current drift | ≤±0.05mA |
| Current consumption | 30mA+IS |
| Response time | <10us |
| Insulation Withstand Voltage | 50Hz,1min, |
| 3KV | |
| Galvanic isolation | -40~+85℃ |
| Ambient operating | -45~+90℃ |
| temperature | |
| Mass | ≈200g |
| Standards | JB/T 7490-2007 |
Remarks:
The false wir ing may resu lt in the damage of the sensor.
VOUT is pos it ive when IP f lows in the d irect ion of the arrow.
Dynamic performances (di/dt and response time) are best with a sing le bar comp lete ly f i ll ing the pr imary hole.
Temperature of the pr imary conductor shou ld not exceed 100 °C.
FAQ:
Q: Are you trading company or manufacturer ?
A: We are an integrated manutacturer of current transformer, encompassing research and development, production, and sales.We provide customers with one-stop energy-saving, high-efficiency electronic component technology solutions.
Q: Can I get samples?
A: Samples order testing is supported, which help customers understand the performance and quality of products more intuitively.
Q:.How long is the sample lead time?
A: For ready samples, it's about 2-3 days. If you require your own size, it takes about 7 days.
Q: How long is the production lead time?
A: Generally 5-7 days for small order, If the goods are not in stock, depending on order quantty and production schedule.
Q: Which kinds of certificate would you have?
A: ISO9001, ISO14001, ROHS, REACH, MSDS.
Q: What is your terms of payment ?
A: 100% payment in advance.
Total amount > USD5000, 30% T/T in advance ,balance pay off before shipment.